2018 irc roof sheathing requirements2018 irc roof sheathing requirements

Cap nail shank shall have a length sufficient to penetrate through the roof sheathing or not less than, The standard calculations contained in ASTM D7158 assume Exposure Category B or C and a. Sprayed polyurethane foam roofs shall have a design. Mineral-surfaced roll roofing shall conform to ASTM D3909 or ASTM D6380, Class M. Mineral-surfaced roll roofing shall be installed in accordance with this chapter and the manufacturer's instructions. arrow_right. For open valleys, valley lining of two plies of mineral-surfaced roll roofing, complying with ASTM D3909 or ASTM D6380 Class M, shall be permitted. Paint systems in accordance with ASTM A 755 shall be applied over steel products with corrosion-resistant coatings complying with ASTM A 792, ASTM A 875, ASTM A 463, or ASTM A 653. The installation of asphalt shingles shall comply with the provisions of this section. Copper, brass, bronze, copper alloy and 300-series stainless steel fasteners shall be used for copper roofs. Mineral-surfaced roll roofing shall conform to ASTM D 3909 or ASTM D 6380, Class M. Mineral-surfaced roll roofing shall be installed in accordance with this chapter and the manufacturer's instructions. The bottom layer shall be 18 inches (457 mm) and the top layer not less than 36 inches (914 mm) wide. Built-up roofs shall be installed in accordance with this chapter and the manufacturer's instructions. Valley linings of the following types shall be permitted: For SI: 1 inch = 25.4 mm, 1 pound = 0.454 kg. Asphalt shingle packaging shall bear a. (R803.1) Spaced lumber sheathing is not allowed in Seismic Design Category D 2. Wood shakes shall be installed in accordance with this chapter and the, The starter course at the eaves shall be doubled and the bottom layer shall be either 15-inch (381 mm), 18-inch (457 mm) or 24-inch (610 mm) wood shakes or wood shingles. Asphalt shingles shall be fastened to solidly sheathed decks. If re-roofing over wood shingle, or wood shake roofs, additional code requirements may apply. Base flashing against a vertical sidewall shall be continuous or step flashing and shall be not less than 4 inches (102 mm) in height and 4 inches (102 mm) in width and shall direct water away from the vertical sidewall onto the roof or into the gutter. For SI: 1 ounce per square foot = 0.305 kg/m. Above-deck thermal insulation board shall comply with the standards in Table R906.2. The installation of sprayed polyurethane foam roofing shall comply with the provisions of this section. Flashing and counterflashing shall be made with sheet metal. Fasteners for asphalt shingles shall be galvanized steel, stainless steel, aluminum or copper roofing nails, minimum 12-gage [0.105 inch (3 mm)] shank with a minimum 3 / 8 -inch- diameter (9.5 mm) head, complying with ASTM F1667, of a length to penetrate through the roofing materials and not less than 3 / 4 inch (19.1 mm) into the roof sheathing. In areas where the average daily temperature in January is 25F (-4C) or less, Wood shingles shall be installed in accordance with this chapter and the manufacturer's instructions. SECTION R802 WOOD ROOF FRAMING. Mineral-surfaced roll roofing shall not be applied on roof. In areas where there has been a history of ice forming along the eaves causing a backup of water as designated in. Asphalt shingles shall be fastened to solidly sheathed decks. Where anchored masonry veneer is provided on the vertical sidewall, the base flashing shall be provided in accordance with this section and counterflashing shall be provided in accordance with, Flashing against a vertical front wall, as well as soil, A drip edge shall be provided at eaves and rake edges of. Roof valley flashing shall be not less than No. The installation of wood shingles shall comply with the provisions of this section. Above-deck thermal insulation board shall comply with the standards in Table R906.2. 2018 irc roof sheathing requirements. Foam plastic materials and installation shall comply with. Modified bitumen roofs shall be installed in accordance with this chapter and the manufacturer's instructions. The installation of liquid-applied roofing shall comply with the provisions of this section. Spaced lumber decking CoL Refer to the manufacturer's technical bulletin regarding requirements for existing deck boards. Asphalt shingles shall be used only on roof slopes of two units vertical in 12 units horizontal (2:12) or greater. Self-adhering polymer-modified bitumen. Sections of flashing shall have an end lap of not less than 4 inches (102 mm). Section R901 General R901.1 Scope The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. Above-deck thermal insulation board shall comply with the standards in Table 906.2. 3. Allowable spans for lumber used as roof sheathing shall conform to Table R803.1. Fasteners for asphalt shingles shall be galvanized steel, stainless steel, aluminum or copper roofing nails, minimum 12-gage [0.105 inch (3 mm)] shank with a minimum 3 / 8 -inch- diameter (9.5 mm) head, complying with ASTM F1667, of a length to penetrate through the roofing materials and not less than 3 / 4 inch (19.1 mm) into the roof sheathing. Asphalt shingles shall comply with ASTM D3462. 0 Table R806.5 of the 2018 IRC lists the thermal insulation requirements for each assembly. Sprayed polyurethane foam roofs shall have a design. Materials and methods of application used for recovering or replacing an existing, The structural roof components shall be capable of supporting the, Flashings shall be reconstructed in accordance with, Chapter 9 addresses the design and construction of, R902.2 Fire-Retardant-Treated Shingles and Shakes, R902.3 Building-Integrated Photovoltaic Product, R902.4 Rooftop-Mounted Photovoltaic Panel Systems, R903.4.1 Secondary (Emergency Overflow) Drains or Scuppers, R904.3 Material Specifications and Physical Characteristics, Section R905 Requirements for Roof Coverings, R905.2.4.1 Wind Resistance of Asphalt Shingles, R905.14 Sprayed Polyurethane Foam Roofing, R905.17 Building-Integrated Photovoltaic (BIPV) Roof Panels Applied Directly to the Roof Deck, Section R907 Rooftop-Mounted Photovoltaic Panel Systems, R907.1 Rooftop-Mounted Photovoltaic Panel Systems, Building-integrated photovoltaic products. CHAPTER 8 ROOF-CEILING CONSTRUCTION. Foam plastic materials and installation shall comply with. Slate shingles shall be secured to the roof with two fasteners per slate. Brace gable end walls taller than 48. inches in height to resist wind forces by installing a framing assembly at each gable wall stud. The installation of wood shakes shall comply with the provisions of this section. Mineral-surfaced roll roofing shall conform to ASTM D3909 or ASTM D6380, Class M. Mineral-surfaced roll roofing shall be installed in accordance with this chapter and the manufacturer's instructions. Participants will be able to use this document to identify changes between the 2015 and 2018 IRC allowing them to apply theses code requirements to design, plan submittals and/or inspection. Wood shingles shall be laid with a side lap not less than 1, NAIL REQUIREMENTS FOR WOOD SHAKES AND WOOD SHINGLES, Roof flashing shall be not less than No. Galvanized fasteners shall be used for steel roofs. For SI: 1 ounce per square foot = 0.305 kg/m, The installation of modified bitumen roofing shall comply with the provisions of this section and the manufacturer's, Modified bitumen roofing shall have a design. Mineral-surfaced roll roofing shall be fastened to solidly sheathed roofs. Copper, brass, bronze, copper alloy and 300-series stainless steel fasteners shall be used for copper roofs. The 4-inch-wide (102 mm) strips of self-adhering polymer-modified-bitumen membrane Galvanized fasteners shall be used for steel roofs. Where required, an ice barrier shall comply with Section 905.1.2. Same as Maximum Ultimate Design Wind Speed, Preservative-treated shakes and shingles of, Fire-retardant-treated shakes and shingles of, Preservative-treated tapersawn shakes of Southern pine treated in accordance with AWPA Standard U1 (Commodity Specification A, Special Requirement 4.6), Forest Products Laboratory of the Texas Forest Services, Preservative-treated tapersawn shakes of Southern Yellow Pine, Asphalt-saturated and asphalt-coated organic felt base sheet, Asphalt-saturated organic felt (perforated), Coal-tar primer used in roofing, dampproofing and waterproofing, ASTM B370 minimum 16 oz/sq ft and 12 oz/sq ft high-yield copper for metal-sheet. Where the existing roof or roof covering is water-soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing. Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. A new Footnote j Materials and methods of application used for re-covering or replacing an existing, The structural roof components shall be capable of supporting the, Roof replacement shall include the removal of existing layers of, Flashings shall be reconstructed in accordance with. Liquid-applied roofing shall have a design. Base flashing shall be of either corrosion-resistant metal of minimum nominal 0.019-inch (0.5 mm) thickness or mineral-surfaced roll roofing weighing not less than 77 pounds per 100 square feet (4 kg/m. Valley and flashing metal shall be a minimum uncoated thickness of 0.0179-inch (0.5 mm) zinc coated G90. Sprayed polyurethane foam roofs shall have a design. Asphalt shingles shall be fastened to solidly sheathed decks. Where siding is provided on the vertical sidewall, the vertical leg of the flashing shall be continuous under the siding. The installation of mineral-surfaced roll roofing shall comply with this section. Wood shakes shall comply with the requirements of Table R905.8.5. 26 gage [0.019 inches (0.5 mm)] corrosion-resistant sheet metal and shall extend 10 inches (254 mm) from the centerline each way for roofs having, Each bundle of shingles shall be identified by a. Foamed-in-place roof insulation shall be installed in accordance with this chapter and the manufacturer's instructions. Drip edges shall extend not less than. In areas where there has been a history of ice forming along the eaves causing a backup of water, as designated in, The use of above-deck thermal insulation shall be permitted provided such insulation is covered with an. Minimum headlap for slate shingles shall be in accordance with Table R905.6.5. Base flashing against a vertical sidewall shall be continuous or step flashing and shall be not less than 4 inches (102 mm) in height and 4 inches (102 mm) in width and shall direct water away from the vertical sidewall onto the roof or into the gutter. Underlayment for asphalt shingles, clay and concrete tile, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles, wood shakes and metal roof panels shall conform to the applicable standards listed in this chapter. DEWALT Building Code Reference: Based on the 2018 International Residential Code | Books & Magazines, Textbooks, Education & Reference, Dictionaries & Reference | eBay! Spray-applied polyurethane foam insulation shall comply with ASTM C1029, Type III or IV or ASTM D7425. Roof Deck Requirements for Installation of Asphalt Shingles Technical . 2018 International Building Code (IBC) BASIC Upgrade to Premium CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES First Version: Aug 2017 All Codes I-Codes Legend Information Code Sections My Notes 2018 International Building Code (IBC) PREFACE arrow_right arrow_right arrow_right arrow_right arrow_right arrow_right arrow_right arrow_right The installation of asphalt shingles shall comply with the provisions of this section. Valley and flashing metal shall be a minimum uncoated thickness of 0.0179-inch (0.5 mm) zinc coated G90. Nails shall be corrosion resistant and not less than 11-gage, Tile shall be applied in accordance with this chapter and the, At the juncture of roof vertical surfaces, flashing and counterflashing shall be provided in accordance with this chapter and the, Roof valley flashing shall be of corrosion-resistant metal of the same material as the. 12 oz/sq ft for preformed metal shingle systems. Where the existing roof has two or more applications of any type of roof . Flashing and counterflashing shall be made with sheet metal. Thermoset single-ply membrane roofs shall have a design. Sprayed polyurethane foam roofs shall have a design. Liquid-applied roofing shall have a design. For open valleys (valley lining exposed) lined with metal, the valley lining shall be not less than 24 inches (610 mm) wide and of any of the corrosion-resistant metals in Table R905.2.8.2. Wood shakes shall be installed in accordance with this chapter and the, The starter course at the eaves shall be doubled and the bottom layer shall be either 15-inch (381 mm), 18-inch (457 mm) or 24-inch (610 mm) wood shakes or wood shingles. For SI: 1 ounce per square foot = 0.305 kg/m, The installation of modified bitumen roofing shall comply with the provisions of this section and the manufacturer's, Modified bitumen roofing shall have a design. hbbd```b``3@$R&5d}"uA$$X ,>,rLYfH 2o2dbO C"=Vbz CHEX/#300 k The second R-value applies when more than half of the insulation is on the interior of the mass wall. Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. Asphalt shingles shall be used only on roof. The installation of wood shingles shall comply with the provisions of this section. Each bundle of shakes shall be identified by a, The installation of built-up roofs shall comply with the provisions of this section and the manufacturer's. The installation of asphalt shingles shall comply with the provisions of this section. Slate shingles shall be fastened to solidly sheathed roofs. Terne coating of 40 lb per double base box, field painted where applicable in accordance with, 0.027 inch minimum thickness: 99.995% electrolytic high-, ASTM D6162; D6163; D6164; D6222; D6223; D6298, As an alternative, self-adhering polymer-modified bitumen, As an alternative, a minimum 4-inch-wide (102 mm) strip of self-adhering polymer-modified bitumen membrane complying with ASTM D1970, installed in accordance with the, The cap nail shank shall be not less than 0.083 inch (2.11 mm) for ring shank cap nails and 0.091 inch (2.31 mm) for smooth shank cap nails. The ratio changes based on climate severity. 26 gage [0.019 inches (0.5 mm)] corrosion-resistant sheet metal and shall extend 10 inches (254 mm) from the centerline each way for roofs having, Each bundle of shingles shall be identified by a. Asphalt shingles shall be tested in accordance with ASTM D7158. Mineral-surfaced roll roofing shall be fastened to solidly sheathed roofs. Each bundle of shakes shall be identified by a, The installation of built-up roofs shall comply with the provisions of this section and the manufacturer's. Class A, B or C roofing shall be installed in, Flashings shall be installed in a manner that prevents moisture from entering the wall and roof through joints in copings, through moisture permeable materials and at intersections with parapet, Flashings shall be installed at wall and roof intersections, wherever there is a change in roof, A cricket or saddle shall be installed on the ridge side of any, The requirements set forth in this section shall apply to the application of, ASTM D6380 Class M mineral-surfaced roll roofing. Sections of flashing shall have an end lap of not less than 4 inches (102 mm). The installation of asphalt shingles shall comply with the provisions of this section. Where siding is provided on the vertical sidewall, the vertical leg of the flashing shall be continuous under the siding. Roof penetrations shall be flashed and sealed in accordance with this chapter. Sections of flashing shall have an end lap of not less than 4 inches (102 mm). Modified bitumen roofs shall be installed in accordance with this chapter and the manufacturer's instructions. 26 gage [0.019 inch (0.5 mm)] corrosion-resistant sheet metal and shall extend not less than 11 inches (279 mm) from the centerline each way. Galvanized fasteners shall be used for steel roofs. Valley linings of the following types shall be permitted: For SI: 1 inch = 25.4 mm, 1 pound = 0.454 kg. Paint systems in accordance with ASTM A755 shall be applied over steel products with corrosion-resistant coatings complying with ASTM A792, ASTM A875, ASTM A463, or ASTM A653. Above-deck thermal insulation board shall comply with the standards in Table R906.2. Where the roof, Where required, ice barriers shall comply with. For open valleys (valley lining exposed) lined with metal, the valley lining shall be not less than 24 inches (610 mm) wide and of any of the corrosion-resistant metals in Table R905.2.8.2. Where anchored masonry veneer is provided on the vertical sidewall, the base flashing shall be provided in accordance with this section and counterflashing shall be provided in accordance with, Flashing against a vertical front wall, as well as soil, A drip edge shall be provided at eaves and rake edges of shingle roofs. For closed valleys (valley covered with shingles), valley lining of one ply of smooth roll roofing complying with ASTM D6380 and not less than 36 inches wide (914 mm) or valley lining as described in Item 1 or 2 shall be permitted. 2 RESIDENTIAL ROOFING GUIDE 2018 IRC. For roofs that provide positive drainage, re-covering or replacing an existing, Complete and separate roofing systems, such as standing-seam metal roof systems, that are designed to transmit the roof loads directly to the building's structural system and do not rely on existing roofs and, The application of a new protective coating over an existing spray polyurethane foam roofing system shall be permitted without tear-off of existing, Where the existing roof has two or more applications of any type of. hb```g``:AX,;nkga3l~/ * ASTM B209, 0.024 minimum thickness for roll-formed panels and 0.019-inch minimum thickness for pressformed shingles. R905.2.1 Sheathing requirements. Built-up roofs shall be installed in accordance with this chapter and the manufacturer's instructions. Sections of flashing shall have an end lap of not less than 4 inches (102 mm). For SI: 1 foot = 304.8 mm; 1 mile per hour = 0.447 m/s. The installation of thermoset single-ply roofing shall comply with the provisions of this section. The installation of thermoplastic single-ply roofing shall comply with the provisions of this section. Slate shingles shall be installed in accordance with this chapter and the manufacturer's instructions. Allowable spans for lumber sheathing shall conform to IRC Table R803.1. arrow_right. Flashing for asphalt shingles shall comply with this section. endstream endobj 202 0 obj <. Same as Maximum Ultimate Design Wind Speed, Asphalt-saturated and asphalt-coated organic felt base sheet, Asphalt-saturated organic felt (perforated), Coal-tar primer used in roofing, dampproofing and waterproofing, ASTM B370 minimum 16 oz/sq ft and 12 oz/sq ft high-yield copper for metal-sheet. For open valleys, valley lining of two plies of mineral-surfaced roll roofing, complying with ASTM D 3909 or ASTM D 6380 Class M, shall be permitted. Chapter 9 also provides requirements for roof drainage, flashing, above-deck thermal insulation, rooftop-mounted photovoltaic systems and recovering or replacing an existing roof covering. Asphalt shingles shall be tested in accordance with ASTM D7158. Asphalt shingle packaging shall bear a. Please see IRC Sec- 1. Install flashing at roof penetrations and wall intersections. . Chapter 9 also provides requirements for roof drainage, flashing, above-deck thermal insulation, rooftop-mounted photovoltaic systems and recovering or replacing an existing roof covering. Slate shingles shall be secured to the roof with two fasteners per slate. 26 gage [0.019 inch (0.5 mm)] corrosion-resistant sheet metal and shall extend not less than 11 inches (279 mm) from the centerline each way. For SI: 1 ounce per square foot = 0.305 kg/m, The installation of modified bitumen roofing shall comply with the provisions of this section and the manufacturer's, Modified bitumen roofing shall have a design. Asphalt shingles shall meet the classification requirements of Table 905.2.4.1 for the appropriate ultimate design wind speed. Nominally, 2-by- For SI: 1 inch = 25.4 mm, 1 mile per hour = 0.447 m/s. Install 7/16 in.-structural sheathing (OSB or plywood) on the vertical face of the gable end wall. satisfy the requirements of 2021 IBC Section 1512, 2018 and 2015 IBC Section 1511, 2012, 2009 and 2006 IBC Section 1510, 2018 and 2021, 2018 and 2015 IRC Section R908 or 2012, 2009 or 2006 IRC Section R907. Wood shingles shall be laid with a side lap not less than 1, Roof flashing shall be not less than No. The installation of sprayed polyurethane foam roofing shall comply with the provisions of this section. The lecture and activity format allows participants to discuss the changes, reasons for the changes, and answer knowledge review questions. Liquid-applied roofing shall be installed in accordance with this chapter and the, Where required, an ice barrier shall comply with, In areas where there has been a history of ice forming along the eaves causing a backup of water, as designated in, The use of above-deck thermal insulation shall be permitted provided that such insulation is covered with an. Liquid-applied roofing shall be installed in accordance with this chapter and the, Where required, an ice barrier shall comply with, In areas where there has been a history of ice forming along the eaves causing a backup of water, as designated in, The use of above-deck thermal insulation shall be permitted provided that such insulation is covered with an. Copper, brass, bronze, copper alloy and 300-series stainless steel fasteners shall be used for copper roofs. Asphalt shingle packaging shall bear a. IRC Section Table 301.5 Minimum Uniformly Distributed Live Loads: Valley linings of the following types shall be permitted: For SI: 1 inch = 25.4 mm, 1 pound = 0.454 kg. The installation of modified bitumen roofing shall comply with the provisions of this section. Drip edges shall extend not less than. A base sheet that complies with the requirements of. Mineral-surfaced roll roofing shall not be applied on roof. Where the existing roof covering is slate, clay, cement or asbestos-cement tile. Modified bitumen roofs shall be installed in accordance with this chapter and the manufacturer's instructions. Valley linings shall be installed in accordance with the manufacturer's instructions before applying shingles. A liquid-applied protective coating that complies with Table R905.14.3 shall be applied not less than 2 hours nor more than 72 hours following the application of the foam. Slate shingles shall be fastened to solidly sheathed roofs. Flashing and counterflashing shall be made with sheet metal. Section R803 Roof Sheathing R803.2 Wood Structural Panel Sheathing (Roof Online Note: This subsection covers plywood and OSB sheathing. In areas where there has been a history of ice forming along the eaves causing a backup of water, as designated in, The use of above-deck thermal insulation shall be permitted provided that such insulation is covered with an. The installation of thermoset single-ply roofing shall comply with the provisions of this section. Valley flashing shall be not less than 15 inches (381 mm) wide. For the most common roof sheathing in our area, which is 1/2" nominal (7/16" actual) sheathing over trusses or rafters at 24" on center . Galvanized fasteners shall be used for steel roofs. %PDF-1.6 % Roofing materials must be installed in accordance with Chapter 9 of the 2020 Minnesota Residential Code and the manufacturer's installation Sheathing Requirements R905.2.1 Asphalt shingles shall be fastened to solidly sheathed decks. Mineral-surfaced roll roofing shall conform to ASTM D3909 or ASTM D6380, Class M. Mineral-surfaced roll roofing shall be installed in accordance with this chapter and the manufacturer's instructions. Mineral-surfaced roll roofing shall be fastened to solidly sheathed roofs. The installation of wood shakes shall comply with the provisions of this section. Slate shingles shall comply with ASTM C406. A liquid-applied protective coating that complies with Table R905.14.3 shall be applied not less than 2 hours nor more than 72 hours following the application of the foam. Wood shakes shall comply with the requirements of Table 905.8.5. Asphalt shingles shall be tested in accordance with ASTM D7158. The bottom layer shall be 18 inches (457 mm) and the top layer not less than 36 inches (914 mm) wide. For open valleys, valley lining of two plies of mineral-surfaced roll roofing, complying with ASTM D3909 or ASTM D6380 Class M, shall be permitted. Thermoplastic single-ply roofs shall be installed in accordance with this chapter and the manufacturer's instructions. The framing assembly incudes horizontal braces, vertical retrofit studs, and compression blocks. Copper, brass, bronze, copper alloy and 300-series stainless steel fasteners shall be used for copper roofs. 233 0 obj <>/Filter/FlateDecode/ID[<4D23A6406EEE004484C52F82EDD55E2A>]/Index[201 60]/Info 200 0 R/Length 141/Prev 323429/Root 202 0 R/Size 261/Type/XRef/W[1 3 1]>>stream

Puerto Rican Green Banana Dumplings, Famous Prisoners In Wisconsin, Salaire Des Policiers Au Togo, Clg 0010 Dod Governmentwide Commercial Purchase Card Overview Exam, Articles OTHER

2018 irc roof sheathing requirements

2018 irc roof sheathing requirements